DOCKING AND REPAIR PROJECTS
YEAR | LOCATION | SMPL INVOLVEMENT | PROJECT NAME | PROJECT DETAILS |
---|---|---|---|---|
2017 | Dubai DD | DOCKING | MT Tour 2 - suezmax tanker | 12 yrs old suezmax tanker, the cargo pump turbine no1 and no 3. , is not operational despite shore workshop attendance. Complete overhaul of turbine with alignment and adjustment is carried out. Pumps tried out with load |
2020 | Colombo DD | DOCKING | Dawn Madurai | 23 yrs, Mr size coastal oil tanker, arrested by administration. Complete docking attended part at Kakinada part at Colombo. |
2011 | Pasir Gudang - Chittagong | REACTIVATION | MT Arc- aframax tanker | 4 years laid up tankers double banked with no crew on board. Complete reactivation of main engine and aux engines incl windlass, ballast tank valves and framo ballast pump |
2012 | Cagliari - Bavnagar | REACTIVATION | MV Okkai - RORO | 18 month laid up vessel at Cagliari - Italy, with twin pielstick engines out of service due to the failure of starting mechanism. Both engine made operational and sailed own power to Bhavnagar |
2013 | cape town- Nakala | REACTIVATION | Mv Rambo- sismic | Diamond dredger arrested at cape town for 3 years. Complete reactivation of engines carried out and vessel delivered to Nakala ( MZQ) on own power |
2013 | Tanjung pelepas- Gadani | REACTIVATION | MT Hero( Herculaes) VLCC tanker | 4 yrs laid up tanker with no axillary generator operational due to bearing issue. Main engine not operated for 5 yrs since used as storage tanker. |
2013 | Labuan- Chittagong | REACTIVATION | Mv Vibe ( VIBEKE)- RORO | Romanian built roro laid up for 3 yrs at Labuan with all machineries dismantled reactivated and delivered Chittagong |
2015 | Dalian- chittagong | REACTIVATION | MT Feng - MR tanker | 10 yrs laid up vessel at Dalian. Vessel machinery and structure which was exposed to sub-zero temp unattended developed multiple issue. Vessel prepared for own power sailing to Bhavnagar. |
2018 | Colombo- Kolkata | REACTIVATION | MV Focus Admiralty- sisemic | 3 yrs laid up seismic vessel at Colombo opl, all machinery out of service. Vessel prepared for own power sailing and IR class inspection for sailing to Kolkata. |
2015 | Colombo- Bhavnagar | MAINTENANCE/ REPAIR | Blue whale- heavy lift carrier | Vessel attended on owners request at Colombo OPL. Main engine bearing & crankshaft failed after sailing drifting south. Main engine made operational with special running condition and sailed to Bhavnagar |
2015 | Batam - Bhavnagar | MAINTENANCE/ REPAIR | MV Lady - containor | Vessel was laid up 18 month at Bantam. On board crew tried to fix the main engine with complete overhaul for 45 days. Vessel attended on owners request at batam. Vessel prepared on own power in 3 days with sea trial. |
2018 | Aruba- POS- Gadani | MAINTENANCE/ REPAIR | MT Pico el Toro- chemical Tanker | 3 yrs laid up chem-oil tanker vessel at Caracas- Venezuela, with main engine ( k series ) repair, delivered to gadani- Pakistan . |
2018 | Batam - Bhavnagar | MAINTENANCE/ REPAIR | LPG NUSA | Loss of engine power, vessel dropped emergency anchor at batam opl. Vessel attended, investigated the failure cause and repair carried out. Vessel tried out in presence of surveyor satisfactory |
2019 | Benin- chittagong | MAINTENANCE/ REPAIR | MT URSU- MR Tanker | On the owners request , attended the vessel at cape town which is been towed due to main engine failure, which was initially sailed from Benin on own power. Engine liners overhauled and Sailed with the vessel to Mauritius. Complete overhaul of main engine carried out, survey completed and vessel sailed to Chittagong on own power. |
2019 | Lagos- cittagong | MAINTENANCE/ REPAIR | MT DIDDI- MR Tanker | Emergency attendance of vessel at port Maputo , vessel’s engines overhauled and tried out to surveyor's satisfaction |
2019/20 | lagos- chittagong | MAINTENANCE/ REPAIR | MT Balva- MR Tanker | 23 yrEmergency attendance of vessel at port louis, vessel lost engines due to critical failure and being towed back to port. Vessel attended to investigate ad rectification of the failure. Engines complete overhauled and tried out to surveyor satisfactions, Mr size coastal oil tanker, arrested by administration. Complete docking attended part at Kakinada part at Colombo. |
2016 | suez- Baniyas- Dubai | REPAIR/DOCKING | MT Ramtin - SuezMAX TANKER | 25v yrs, framo (one of only 2 suezmax tankers). Dry-docking of typical suezmax tanker at Dubai. Vessel was grounded in Suez canal badly damaged bow area, due to the failure fuel pump which engine crankshaft. Vessel attended on owners request temporary repair of engine carried out. Sailed with vessel to baniyas back to dubai for dry-dock preparation. Complete camshaft replaced with new fabricated one, with 4 no framo pump overhaul along with other work. |